What should a written construction estimate include?

https://smofcon28.org/industrial-contractor-in-albany-ny-what-to-know-before-you-build/

Exclusions, contingency named as a number, allowances with their basis, a schedule showing permit review separately, and long-lead items identified. The exclusions are where quotes actually diverge.